In The News

pbl-3421-underway-1

PBL 3421 Underway

Ed Shearer, Principal Naval Architect with The Shearer Group, Inc., announces the delivery of the “PBL 3421” by Raymond & Associates, LLC, Bayou La Batre, AL, to Progressive Barge Line, Inc., New Orleans. This is the first of two barges, both 297’- 6” X 54’ X 12’ inland service double skin tank barges each having a cargo capacity of about 4700 short tons at 11’- 6” draft. 

job-opening-1

Job Opening

The Shearer Group, Inc. is seeking an engineering manager for its growing naval architecture practice in Seabrook, Texas.

full-speed-ahead-1

Full Speed Ahead

Together, Bristol Harbor Group, Inc. and The Shearer Group, Inc. provide naval architecture, marine engineering, marine surveying and professional engineer services to clients in the inland and offshore marine industries. The combined companies have been in business for decades and look forward to many years of success ahead of them.

logo-shearer-footer

The Shearer Group, Inc. is a full-service naval architecture, marine engineering and marine surveying firm specializing in commercial vessel design and consulting.

Core Values

  • Technical Excellence
  • Attention to Detail
  • Customer Centric
  • Engineering Ethics
  • Professionalism
  • Responsibility

Associations

sname-150
HMM_LOGO_NoBackground (1)
AWO_logo
pva-logo-color

Contact Us

The Shearer Group, Inc.
3118 Harrisburg Blvd., Suite 100
Houston, TX 77003

Copyright 2018 ©  The Shearer Group, Inc. | All Rights Reserved