Houston, Texas – October 3rd, 2019 – In 2017, The Shearer Group, Inc. (TSGI) was awarded a five-year Indefinite Deliverable contract with the Texas Department of Transportation (TxDOT). TSGI was tasked to provide the detail design of a double-ended diesel-electric ferry with energy storage capable of carrying construction 495 passengers / 70 cars, providing service from Galveston Island to Bolivar Peninsula. The ferry is currently being built at Gulf Island Shipyard in Jennings, Louisiana. TSGI will provide construction oversight to TxDOT during the entire construction process.